United States βΊ Grid βΊ Interconnection queues βΊ Florida
NUCLEAR Β· SOUTHEASTNuclear project 8, Sumter County
Nuclear project 8, Sumter County is a 1,150 MW nuclear request withdrawn in the Southeast interconnection queue, in Sumter County, Florida, connecting to Duke Energy Florida.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2000 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 8
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Duke Energy Florida, LLC
- Connection point (POI)
- Central Florida Substation 230 kV
- Location
- Sumter County, Florida
- Technology
- Nuclear: 1,150 MW
- Total requested
- 1,150 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 6 April 2000
Location
Marker shows the centre of Sumter County; the queue data does not give exact sites.
Other requests in Sumter County
- Solar project 322, Sumter CountySolar Β· 74.9 MW Β· under construction
- Solar project FC100004, Sumter CountySolar Β· 74.9 MW Β· in study
- Solar project 321, Sumter CountySolar Β· 74.9 MW Β· built
- Other project 144, Sumter CountyOther Β· 560 MW Β· withdrawn
- Solar project 271, Sumter CountySolar Β· 74.5 MW Β· withdrawn
- Solar project 266, Sumter CountySolar Β· 74.5 MW Β· withdrawn
- Solar project 233, Sumter CountySolar Β· 74.5 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem