United States β€Ί Grid β€Ί Interconnection queues β€Ί Florida

OTHER Β· SOUTHEAST

Other project 144, Sumter County

Other project 144, Sumter County is a 560 MW other request withdrawn in the Southeast interconnection queue, in Sumter County, Florida, connecting to Duke Energy Florida.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2016 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
144
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Duke Energy Florida
Developer
Masked
Connection point (POI)
Sumter Substation
Location
Sumter County, Florida
Technology
Solar: 560 MW Β· Gas
Total requested
560 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
6 May 2016
Proposed online date
May 2021

Location

Marker shows the centre of Sumter County; the queue data does not give exact sites.

Power plants in Florida Β· Transmission lines in Florida

Other requests in Sumter County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem