United States β€Ί Grid β€Ί Interconnection queues β€Ί Pennsylvania

GAS Β· PJM

Gas project AH1-674, Beaver County

Gas project AH1-674, Beaver County is a 1,700 MW gas request withdrawn in the PJM interconnection queue, in Beaver County, Pennsylvania, connecting to ATSI.

Queue statusWithdrawn / abandoned
  1. Planning (completed)
  2. Withdrawn / abandonedApr 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AH1-674
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
ATSI
Developer
Shippingport Power Station, LLC
Location
Beaver County, Pennsylvania
Technology
Gas: 1,700 MW
Total requested
1,700 MW
Service type
Network resource (NRIS)
Study phase
In Progress (unknown study)
Queue status
Withdrawn
Proposed online date
December 2028
Withdrawn
April 2025

Location

Marker shows the centre of Beaver County; the queue data does not give exact sites.

Power plants in Pennsylvania Β· Transmission lines in Pennsylvania

Other requests in Beaver County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem