United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
GAS Β· PJMGas project Z1-105, Clarion County
Gas project Z1-105, Clarion County is a 19.9 MW gas request withdrawn in the PJM interconnection queue, in Clarion County, Pennsylvania, connecting to PENELEC.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2013 (completed)
- Withdrawn / abandonedFeb 2015 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- Z1-105
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PENELEC
- Connection point (POI)
- Emlenton 34.5kV
- Location
- Clarion County, Pennsylvania
- Technology
- Gas: 19.9 MW
- Total requested
- 19.9 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 31 October 2013
- Proposed online date
- July 2015
- Withdrawn
- February 2015
Location
Marker shows the centre of Clarion County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Clarion County
- GardeniaSolar + storage Β· 46.5 MW Β· in study
- Solar project AH2-187, Clarion CountySolar Β· 20.0 MW Β· in study
- Solar project AH2-128, Clarion CountySolar Β· 8.0 MW Β· in study
- CL-Route 58 BSolar Β· 13.5 MW Β· suspended
- Cobalt SolarSolar Β· 18.9 MW Β· built
- Clarion BoardsGas Β· 18.0 MW Β· built
- Piney Station (Piney 1-3)Hydro Β· 5.3 MW Β· built
- Mahoning Creek Hydroelectric PlantHydro Β· 1.5 MW Β· built
- Onshore wind project Y1-031, Clarion CountyOnshore wind Β· 102 MW Β· withdrawn
- Solar project AH1-242, Clarion CountySolar Β· 30.0 MW Β· withdrawn
- Solar project AH1-243, Clarion CountySolar Β· 30.0 MW Β· withdrawn
- Solar project AG2-143, Clarion CountySolar Β· 20.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem