COAL Β· MISO

Coal project G542, Beaver County

Coal project G542, Beaver County is a 50.0 MW coal request withdrawn in the MISO interconnection queue, in Beaver County, Pennsylvania.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2005 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. ConsentedJan 2006 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G542
Grid region
MISO (Midcontinent)
Connection point (POI)
FE Mansfield Two
Location
Beaver County, Pennsylvania
Technology
Coal: 50.0 MW
Total requested
50.0 MW
Study phase
IA Executed
Queue status
Withdrawn
Entered queue
2 September 2005
Agreement signed
13 January 2006
Proposed online date
April 2008

Location

Marker shows the centre of Beaver County; the queue data does not give exact sites.

Power plants in Pennsylvania Β· Transmission lines in Pennsylvania

Other requests in Beaver County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem