United States βΊ Grid βΊ Interconnection queues βΊ Oklahoma
SOLAR + STORAGE Β· SPPSolar + storage project GEN-2023-100, Woods County
Solar + storage project GEN-2023-100, Woods County is a 300 MW solar + storage request withdrawn in the SPP interconnection queue, in Woods County, Oklahoma, connecting to OGE.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2023 (completed)
- Withdrawn / abandonedAug 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2023-100
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- OGE
- Connection point (POI)
- Degrasse 345 kV Substation
- Location
- Woods County, Oklahoma
- Technology
- Solar: 300 MW Β· Battery
- Total requested
- 300 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 2 October 2023
- Proposed online date
- December 2027
- Withdrawn
- August 2025
Location
Marker shows the centre of Woods County; the queue data does not give exact sites.
Other requests in Woods County
- Solar project GEN-2019-045, Woods CountySolar Β· 155 MW Β· agreement signed
- Solar + storage project GEN-2023-102, Woods CountySolar + storage Β· 475 MW Β· in study
- Onshore wind project GEN-2024-135, Woods CountyOnshore wind Β· 250 MW Β· in study
- Onshore wind project GEN-2024-134, Woods CountyOnshore wind Β· 250 MW Β· in study
- Solar + storage project GEN-2023-104, Woods CountySolar + storage Β· 100 MW Β· in study
- Onshore wind project GEN-2015-095, Woods CountyOnshore wind Β· 176 MW Β· withdrawn
- Battery storage project GEN-2019-046, Woods CountyBattery storage Β· 90.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem