United States βΊ Grid βΊ Interconnection queues βΊ Oklahoma
BATTERY STORAGE Β· SPPBattery storage project GEN-2019-046, Woods County
Battery storage project GEN-2019-046, Woods County is a 90.0 MW battery storage request withdrawn in the SPP interconnection queue, in Woods County, Oklahoma, connecting to OGE.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2019 (completed)
- Withdrawn / abandonedDec 2022 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- OperatingDec 2022 (not reached)
- Closed (not reached)
Request details
- Queue ID
- GEN-2019-046
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- OGE
- Connection point (POI)
- DeGrasse 138kV substation
- Location
- Woods County, Oklahoma
- Technology
- Battery: 90.0 MW
- Total requested
- 90.0 MW
- Service type
- NRIS and ERIS
- Study phase
- WITHDRAWN
- Queue status
- Withdrawn
- Entered queue
- 24 May 2019
- Proposed online date
- December 2022
- Came online
- December 2022
- Withdrawn
- December 2022
Location
Marker shows the centre of Woods County; the queue data does not give exact sites.
Other requests in Woods County
- Solar project GEN-2019-045, Woods CountySolar Β· 155 MW Β· agreement signed
- Solar + storage project GEN-2023-102, Woods CountySolar + storage Β· 475 MW Β· in study
- Onshore wind project GEN-2024-135, Woods CountyOnshore wind Β· 250 MW Β· in study
- Onshore wind project GEN-2024-134, Woods CountyOnshore wind Β· 250 MW Β· in study
- Solar + storage project GEN-2023-104, Woods CountySolar + storage Β· 100 MW Β· in study
- Solar + storage project GEN-2023-100, Woods CountySolar + storage Β· 300 MW Β· withdrawn
- Onshore wind project GEN-2015-095, Woods CountyOnshore wind Β· 176 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem