United States › Grid › Interconnection queues › Iowa
BATTERY STORAGE · MISOReplacing 150 MW of coal generation with BESS at Lansing; Lansing 4
Replacing 150 MW of coal generation with BESS at Lansing; Lansing 4 is a 150 MW battery storage request in interconnection study in the MISO interconnection queue, in Allamakee County, Iowa, connecting to ITC MIDWEST.
- PlanningQueued Apr 2025 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Jun 2026 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- R5064
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ITC MIDWEST
- Connection point (POI)
- Lansing
- Location
- Allamakee County, Iowa
- Technology
- Battery: 150 MW
- Total requested
- 150 MW
- Queue status
- Active
- Entered queue
- 8 April 2025
- Proposed online date
- June 2026
Location
Marker shows the centre of Allamakee County; the queue data does not give exact sites.
Other requests in Allamakee County
- Replacing 130 MW of coal generation with BESS at Lansing; Lansing 4Battery storage · 130 MW · in study
- Replacing 100 MW of existing coal generation with 28 Power Electronic 4.01 MVA at Lansing Generation Station; Lansing 4Other · 280 MW · withdrawn
- Onshore wind project G869, Allamakee CountyOnshore wind · 200 MW · withdrawn
- Replacing 180MW with BESS of the existing 280 MW Steam; LANSING 4Other · 180 MW · withdrawn
- Onshore wind project J3527, Allamakee CountyOnshore wind · 136 MW · withdrawn
- Battery storage project J1733, Allamakee CountyBattery storage · 50.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem