United States › Grid › Interconnection queues › Iowa

OTHER · MISO

Replacing 100 MW of existing coal generation with 28 Power Electronic 4.01 MVA at Lansing Generation Station; Lansing 4

Replacing 100 MW of existing coal generation with 28 Power Electronic 4.01 MVA at Lansing Generation Station; Lansing 4 is a 280 MW other request withdrawn in the MISO interconnection queue, in Allamakee County, Iowa, connecting to Alliant Energy West.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2022 (completed)
  2. Withdrawn / abandonedMar 2024 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
R1018
Grid region
MISO (Midcontinent)
Utility / transmission owner
Alliant Energy West
Connection point (POI)
Lansing 161 kV substation
Location
Allamakee County, Iowa
Technology
Other: 280 MW · Battery
Total requested
280 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
23 February 2022
Proposed online date
March 2025
Withdrawn
March 2024

Location

Marker shows the centre of Allamakee County; the queue data does not give exact sites.

Power plants in Iowa · Transmission lines in Iowa

Other requests in Allamakee County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem