ONSHORE WIND Β· MISOOnshore wind project G869, Allamakee County
Onshore wind project G869, Allamakee County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Allamakee County, Iowa.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2007 (completed)
- Withdrawn / abandonedMar 2009 (project stopped here)
- ConsentedMar 2009 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G869
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- ITC Midwest Decorah - Lansing 161 kV
- Location
- Allamakee County, Iowa
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Study phase
- SPA - SIS
- Queue status
- Withdrawn
- Entered queue
- 1 October 2007
- Agreement signed
- 5 March 2009
- Proposed online date
- December 2009
- Withdrawn
- March 2009
Location
Marker shows the centre of Allamakee County; the queue data does not give exact sites.
Other requests in Allamakee County
- Replacing 150 MW of coal generation with BESS at Lansing; Lansing 4Battery storage Β· 150 MW Β· in study
- Replacing 130 MW of coal generation with BESS at Lansing; Lansing 4Battery storage Β· 130 MW Β· in study
- Replacing 100 MW of existing coal generation with 28 Power Electronic 4.01 MVA at Lansing Generation Station; Lansing 4Other Β· 280 MW Β· withdrawn
- Replacing 180MW with BESS of the existing 280 MW Steam; LANSING 4Other Β· 180 MW Β· withdrawn
- Onshore wind project J3527, Allamakee CountyOnshore wind Β· 136 MW Β· withdrawn
- Battery storage project J1733, Allamakee CountyBattery storage Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem