United States › Grid › Interconnection queues › Iowa
OTHER · MISOReplacing 180MW with BESS of the existing 280 MW Steam; LANSING 4
Replacing 180MW with BESS of the existing 280 MW Steam; LANSING 4 is a 180 MW other request withdrawn in the MISO interconnection queue, in Allamakee County, Iowa, connecting to ITC MIDWEST.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2023 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- R1037
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- ITC MIDWEST
- Connection point (POI)
- ITCM Lansing 161kV
- Location
- Allamakee County, Iowa
- Technology
- Other: 180 MW · Battery
- Total requested
- 180 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 28 September 2023
- Proposed online date
- February 2026
Location
Marker shows the centre of Allamakee County; the queue data does not give exact sites.
Other requests in Allamakee County
- Replacing 150 MW of coal generation with BESS at Lansing; Lansing 4Battery storage · 150 MW · in study
- Replacing 130 MW of coal generation with BESS at Lansing; Lansing 4Battery storage · 130 MW · in study
- Replacing 100 MW of existing coal generation with 28 Power Electronic 4.01 MVA at Lansing Generation Station; Lansing 4Other · 280 MW · withdrawn
- Onshore wind project G869, Allamakee CountyOnshore wind · 200 MW · withdrawn
- Onshore wind project J3527, Allamakee CountyOnshore wind · 136 MW · withdrawn
- Battery storage project J1733, Allamakee CountyBattery storage · 50.0 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem