United States β€Ί Grid β€Ί Interconnection queues β€Ί Ohio

COAL Β· PJM

Gavin Unit #2

Gavin Unit #2 is a 36.0 MW coal request built and operating in the PJM interconnection queue, in Gallia County, Ohio, connecting to AEP.

Queue statusOperating
  1. PlanningQueued Feb 2013 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingJan 2015 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
Y3-036
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Gavin Unit 2
Location
Gallia County, Ohio
Technology
Coal: 36.0 MW
Total requested
36.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
28 February 2013
Proposed online date
December 2014
Came online
January 2015

Location

Marker shows the centre of Gallia County; the queue data does not give exact sites.

Power plants in Ohio Β· Transmission lines in Ohio

Other requests in Gallia County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem