United States β€Ί Grid β€Ί Interconnection queues β€Ί Ohio

COAL Β· PJM

Gavin Unit No. 2

Gavin Unit No. 2 is a 11.0 MW coal request built and operating in the PJM interconnection queue, in Gallia County, Ohio, connecting to AEP.

Queue statusOperating
  1. PlanningQueued May 2018 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingJun 2021 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
AE1-021
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Gavin #2 765 kV
Location
Gallia County, Ohio
Technology
Coal: 11.0 MW
Total requested
11.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
24 May 2018
Proposed online date
June 2021
Came online
June 2021

Location

Marker shows the centre of Gallia County; the queue data does not give exact sites.

Power plants in Ohio Β· Transmission lines in Ohio