United States β€Ί Grid β€Ί Interconnection queues β€Ί Ohio

COAL Β· PJM

Gavin Unit No. 1

Gavin Unit No. 1 is a 11.0 MW coal request built and operating in the PJM interconnection queue, in Gallia County, Ohio, connecting to AEP.

Queue statusOperating
  1. PlanningQueued Jul 2019 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingMay 2025 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
AF1-051
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
AEP
Connection point (POI)
Gavin 765 kV
Location
Gallia County, Ohio
Technology
Coal: 11.0 MW
Total requested
11.0 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
Queue status
Operational
Entered queue
13 July 2019
Proposed online date
May 2025
Came online
May 2025

Location

Marker shows the centre of Gallia County; the queue data does not give exact sites.

Power plants in Ohio Β· Transmission lines in Ohio

Other requests in Gallia County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem