United States β€Ί Grid β€Ί Interconnection queues β€Ί Texas

GAS Β· SPP

Gas project GEN-2001-008, Ector County

Gas project GEN-2001-008, Ector County is a 500 MW gas request withdrawn in the SPP interconnection queue, in Ector County, Texas, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2001 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2001-008
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Location
Ector County, Texas
Technology
Gas: 500 MW
Total requested
500 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
5 March 2001

Location

Marker shows the centre of Ector County; the queue data does not give exact sites.

Power plants in Texas Β· Transmission lines in Texas

Other requests in Ector County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem