SOLAR Β· PJMSolar project AG1-133, Spotsylvania County
Solar project AG1-133, Spotsylvania County is a 128 MW solar request withdrawn in the PJM interconnection queue, in Spotsylvania County, Virginia, connecting to Dominion.
Queue statusWithdrawn / abandoned
- PlanningQueued Sep 2020 (completed)
- Withdrawn / abandonedJun 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AG1-133
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- Dominion
- Developer
- Virginia Electric and Power Company
- Connection point (POI)
- North Anna-Ladysmith 500 kV
- Location
- Spotsylvania County, Virginia
- Technology
- Solar: 128 MW
- Total requested
- 128 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study
- Queue status
- Withdrawn
- Entered queue
- 2 September 2020
- Proposed online date
- December 2024
- Withdrawn
- June 2024
Location
Marker shows the centre of Spotsylvania County; the queue data does not give exact sites.
Other requests in Spotsylvania County
- Battery storage project AI1-018, Spotsylvania CountyBattery storage Β· 300 MW Β· in study
- Battery storage project AH1-263, Spotsylvania CountyBattery storage Β· 200 MW Β· in study
- Solar project AI2-038, Spotsylvania CountySolar Β· 150 MW Β· in study
- Tavern Energy LLCBattery storage Β· 50.0 MW Β· in study
- Spotsylvania Energy CenterSolar Β· 485 MW Β· built
- Solar project AE1-047, Spotsylvania CountySolar Β· 300 MW Β· withdrawn
- Solar project AD2-193, Spotsylvania CountySolar Β· 209 MW Β· withdrawn
- Solar project AH1-456, Spotsylvania CountySolar Β· 80.0 MW Β· withdrawn
- Battery storage project AG2-318, Spotsylvania CountyBattery storage Β· 75.0 MW Β· withdrawn
- Solar project AH1-250, Spotsylvania CountySolar Β· 60.0 MW Β· withdrawn
- Battery storage project AH1-457, Spotsylvania CountyBattery storage Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem