United States β€Ί Grid β€Ί Interconnection queues β€Ί Pennsylvania

SOLAR + STORAGE Β· PJM

Solar + storage project AH1-448, Carbon County

Solar + storage project AH1-448, Carbon County is a 180 MW solar + storage request withdrawn in the PJM interconnection queue, in Carbon County, Pennsylvania, connecting to PPL.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2021 (completed)
  2. Withdrawn / abandonedOct 2021 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AH1-448
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PPL
Connection point (POI)
East Palmerton-Harwood 230 kV
Location
Carbon County, Pennsylvania
Technology
Solar: 180 MW Β· Battery
Total requested
180 MW
Service type
Network resource (NRIS)
Study phase
Feasibility Study
Queue status
Withdrawn
Entered queue
10 September 2021
Proposed online date
December 2024
Withdrawn
October 2021

Location

Marker shows the centre of Carbon County; the queue data does not give exact sites.

Power plants in Pennsylvania Β· Transmission lines in Pennsylvania

Other requests in Carbon County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem