United States βΊ Grid βΊ Interconnection queues βΊ Pennsylvania
ONSHORE WIND Β· PJMOnshore wind project Z2-008, Carbon County
Onshore wind project Z2-008, Carbon County is a 99.0 MW onshore wind request withdrawn in the PJM interconnection queue, in Carbon County, Pennsylvania, connecting to PPL.
Queue statusWithdrawn / abandoned
- PlanningQueued Dec 2013 (completed)
- Withdrawn / abandonedSep 2014 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- Z2-008
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- PPL
- Connection point (POI)
- East Palmerton-Wagner 69kV
- Location
- Carbon County, Pennsylvania
- Technology
- Wind: 99.0 MW
- Total requested
- 99.0 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study
- Queue status
- Withdrawn
- Entered queue
- 9 December 2013
- Proposed online date
- December 2017
- Withdrawn
- September 2014
Location
Marker shows the centre of Carbon County; the queue data does not give exact sites.
Power plants in Pennsylvania Β· Transmission lines in Pennsylvania
Other requests in Carbon County
- Mora SolarSolar Β· 60.0 MW Β· agreement signed
- Solar project AI1-038, Carbon CountySolar Β· 95.8 MW Β· in study
- Solar project AG2-074, Carbon CountySolar Β· 38.0 MW Β· in study
- PA Solar ParkSolar Β· 10.0 MW Β· built
- PA SPSolar Β· 10.0 MW Β· built
- Onshore wind project Z2-007, Carbon CountyOnshore wind Β· 213 MW Β· withdrawn
- Onshore wind project AA1-103, Carbon CountyOnshore wind Β· 209 MW Β· withdrawn
- Solar + storage project AH1-448, Carbon CountySolar + storage Β· 180 MW Β· withdrawn
- Onshore wind project N51, Carbon CountyOnshore wind Β· 101 MW Β· withdrawn
- Penn Forest Wind ProjectOnshore wind Β· 98.0 MW Β· withdrawn
- Broad MountainWind + storage Β· 90.0 MW Β· withdrawn
- Coal project V3-004, Carbon CountyCoal Β· 83.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem