United States βΊ Grid βΊ Interconnection queues βΊ Florida
COAL Β· SOUTHEASTCoal project 57, Citrus County
Coal project 57, Citrus County is a 4.0 MW coal request withdrawn in the Southeast interconnection queue, in Citrus County, Florida, connecting to Duke Energy Florida.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2007 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 57
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Duke Energy Florida
- Developer
- Duke Energy Florida, LLC
- Connection point (POI)
- Crystal River Substation
- Location
- Citrus County, Florida
- Technology
- Coal: 4.0 MW
- Total requested
- 4.0 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 12 January 2007
- Proposed online date
- March 2012
Location
Marker shows the centre of Citrus County; the queue data does not give exact sites.
Other requests in Citrus County
- Battery storage project 327, Citrus CountyBattery storage Β· 100 MW Β· under construction
- Battery storage project FC100380, Citrus CountyBattery storage Β· 199 MW Β· in study
- Gas project 123, Citrus CountyGas Β· 940 MW Β· built
- Gas project 124, Citrus CountyGas Β· 940 MW Β· built
- Solar project 199, Citrus CountySolar Β· 74.9 MW Β· built
- Coal project 42, Citrus CountyCoal Β· 10.0 MW Β· built
- Coal project 43, Citrus CountyCoal Β· 10.0 MW Β· built
- Coal project 45, Citrus CountyCoal Β· 10.0 MW Β· built
- Coal project 44, Citrus CountyCoal Β· 10.0 MW Β· built
- Gas project 111, Citrus CountyGas Β· 950 MW Β· withdrawn
- Gas project 10, Citrus CountyGas Β· 700 MW Β· withdrawn
- Nuclear project 41, Citrus CountyNuclear Β· 140 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem