BATTERY STORAGE · NYISO

Enel NYPA Astoria

Enel NYPA Astoria is a 100 MW battery storage request withdrawn in the NYISO interconnection queue, in Queens County, New York, connecting to ConEd.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2019 (completed)
  2. Withdrawn / abandonedJan 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
926
Grid region
NYISO (New York)
Utility / transmission owner
ConEd
Developer
Enel Energy Storage Holdings, LLC
Connection point (POI)
Astoria 138 kV substation
Location
Queens County, New York
Technology
Battery: 100 MW
Total requested
100 MW
Queue status
Withdrawn
Entered queue
18 October 2019
Withdrawn
January 2020

Location

Marker shows the centre of Queens County; the queue data does not give exact sites.

Power plants in New York · Transmission lines in New York

Other requests in Queens County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem