United States βΊ Grid βΊ Interconnection queues βΊ Iowa
ONSHORE WIND Β· WESTOnshore wind project GI-0807a, Palo Alto County
Onshore wind project GI-0807a, Palo Alto County is a 200 MW onshore wind request withdrawn in the West interconnection queue, in Palo Alto County, Iowa, connecting to WAPA/BEPC/HCPD Integrated System.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2008 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- GI-0807a
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA/BEPC/HCPD Integrated System
- Connection point (POI)
- Spencer-Osgood 161kV
- Location
- Palo Alto County, Iowa
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Service type
- NRIS and ERIS
- Study phase
- IAP
- Queue status
- Withdrawn
- Entered queue
- 31 March 2008
- Proposed online date
- July 2010
Location
Marker shows the centre of Palo Alto County; the queue data does not give exact sites.
Other requests in Palo Alto County
- Solar project J877, Palo Alto CountySolar Β· 250 MW Β· under construction
- Onshore wind project J3324, Palo Alto CountyOnshore wind Β· 200 MW Β· in study
- Onshore wind project J1270, Palo Alto CountyOnshore wind Β· 200 MW Β· in study
- Onshore wind project J529, Palo Alto CountyOnshore wind Β· 250 MW Β· built
- Onshore wind project J590, Palo Alto CountyOnshore wind Β· 90.0 MW Β· built
- Onshore wind project J731, Palo Alto CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project GI-0612a, Palo Alto CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project GI-0703a, Palo Alto CountyOnshore wind Β· 101 MW Β· withdrawn
- Onshore wind project G554, Palo Alto CountyOnshore wind Β· 100 MW Β· withdrawn
- Other project G317, Palo Alto CountyOther Β· 80.0 MW Β· withdrawn
- Onshore wind project J938, Palo Alto CountyOnshore wind Β· 50.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem