United States › Grid › Interconnection queues › Iowa

ONSHORE WIND · MISO

Onshore wind project J3324, Palo Alto County

Onshore wind project J3324, Palo Alto County is a 200 MW onshore wind request in interconnection study in the MISO interconnection queue, in Palo Alto County, Iowa, connecting to MIDAMERICAN ENERGY CO..

Queue statusIn planning
  1. PlanningQueued Apr 2024 (current stage)
  2. Consented (not yet reached)
  3. Construction (not yet reached)
  4. OperatingTarget Sep 2029 (not yet reached)
  5. Closed (not yet reached)

Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.

Request details

Queue ID
J3324
Grid region
MISO (Midcontinent)
Utility / transmission owner
MIDAMERICAN ENERGY CO.
Connection point (POI)
PALO ALTO - KOSSUTH COUNTY 345.0kV
Location
Palo Alto County, Iowa
Technology
Wind: 200 MW
Total requested
200 MW
Service type
Network resource (NRIS)
Study phase
Study Phase: DPP 1
Queue status
Active
Entered queue
18 April 2024
Proposed online date
September 2029

Location

Marker shows the centre of Palo Alto County; the queue data does not give exact sites.

Power plants in Iowa · Transmission lines in Iowa

Other requests in Palo Alto County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem