United States β€Ί Grid β€Ί Interconnection queues β€Ί Iowa

ONSHORE WIND Β· WEST

Onshore wind project GI-0703a, Palo Alto County

Onshore wind project GI-0703a, Palo Alto County is a 101 MW onshore wind request withdrawn in the West interconnection queue, in Palo Alto County, Iowa, connecting to WAPA/BEPC/HCPD Integrated System.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Feb 2007 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GI-0703a
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA/BEPC/HCPD Integrated System
Connection point (POI)
Osgood-Spencer 161kV
Location
Palo Alto County, Iowa
Technology
Wind: 101 MW
Total requested
101 MW
Service type
NRIS and ERIS
Study phase
IAP
Queue status
Withdrawn
Entered queue
23 February 2007
Proposed online date
December 2008

Location

Marker shows the centre of Palo Alto County; the queue data does not give exact sites.

Power plants in Iowa Β· Transmission lines in Iowa

Other requests in Palo Alto County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem