Solar project IC-637, Hancock County

Solar project IC-637, Hancock County is a 60.0 MW solar request withdrawn in the Southeast interconnection queue, in Hancock County, Georgia, connecting to Southern Company.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2017 (completed)
  2. Withdrawn / abandonedJan 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
IC-637
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Southern Company
Connection point (POI)
Sinclair Dam - Warrenton Primary 115 kV Line
Location
Hancock County, Georgia
Technology
Solar: 60.0 MW
Total requested
60.0 MW
Service type
NRIS and ERIS
Study phase
Withdrawn
Queue status
Withdrawn
Entered queue
28 April 2017
Withdrawn
January 2018

Location

Marker shows the centre of Hancock County; the queue data does not give exact sites.

Power plants in Georgia Β· Transmission lines in Georgia

Other requests in Hancock County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem