United States βΊ Grid βΊ Interconnection queues βΊ Georgia
SOLAR Β· SOUTHEASTSolar project IC-1193, Hancock County
Solar project IC-1193, Hancock County is a 200 MW solar request withdrawn in the Southeast interconnection queue, in Hancock County, Georgia, connecting to Southern Company.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2023 (completed)
- Withdrawn / abandonedApr 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- IC-1193
- Grid region
- Southeast (non-ISO utilities)
- Utility / transmission owner
- Southern Company
- Connection point (POI)
- Branch - Springhill Church 230 kV Line
- Location
- Hancock County, Georgia
- Technology
- Solar: 200 MW
- Total requested
- 200 MW
- Service type
- NRIS and ERIS
- Study phase
- Withdrawn
- Queue status
- Withdrawn
- Entered queue
- 26 October 2023
- Proposed online date
- January 2028
- Withdrawn
- April 2024
Location
Marker shows the centre of Hancock County; the queue data does not give exact sites.
Other requests in Hancock County
- Gas project 25-IC-1330, Hancock CountyGas Β· 759 MW Β· in study
- Battery storage project 25-IC-1374, Hancock CountyBattery storage Β· 600 MW Β· in study
- Battery storage project 25-IC-1385, Hancock CountyBattery storage Β· 450 MW Β· in study
- Solar + storage project 25-IC-1339, Hancock CountySolar + storage Β· 165 MW Β· in study
- Gas project IC-244, Hancock CountyGas Β· 1,918 MW Β· withdrawn
- Gas project IC-243, Hancock CountyGas Β· 959 MW Β· withdrawn
- Gas project IC-068, Hancock CountyGas Β· 630 MW Β· withdrawn
- Gas project IC-067, Hancock CountyGas Β· 630 MW Β· withdrawn
- Battery storage project 25-IC-1386, Hancock CountyBattery storage Β· 450 MW Β· withdrawn
- Solar project IC-587, Hancock CountySolar Β· 176 MW Β· withdrawn
- Solar project IC-586, Hancock CountySolar Β· 100 MW Β· withdrawn
- Solar project IC-637, Hancock CountySolar Β· 60.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem