ONSHORE WIND · NYISOWinergy NYC Wind Farm
Winergy NYC Wind Farm is a 600 MW onshore wind request withdrawn in the NYISO interconnection queue, in New York County, New York, connecting to ConEd.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2007 (completed)
- Withdrawn / abandonedJul 2012 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 267
- Grid region
- NYISO (New York)
- Utility / transmission owner
- ConEd
- Developer
- Winergy Power, LLC
- Connection point (POI)
- Gowanus Substation 345kV
- Location
- New York County, New York
- Technology
- Wind: 600 MW
- Total requested
- 600 MW
- Queue status
- Withdrawn
- Entered queue
- 30 November 2007
- Withdrawn
- July 2012
Location
Marker shows the centre of New York County; the queue data does not give exact sites.
Other requests in New York County
- East River RepoweringGas · 288 MW · built
- East River RepoweringGas · 288 MW · built
- KeySpan RavenswoodGas · 270 MW · built
- KeySpan RavenswoodGas · 270 MW · built
- Hell GateGas · 79.9 MW · built
- Harlem River YardsGas · 79.9 MW · built
- Harlem River YardsGas · 79.9 MW · built
- Hell GateGas · 79.9 MW · built
- Vernon BlvdGas · 79.9 MW · built
- Vernon BlvdGas · 79.9 MW · built
- 23rd St and 3rd AveGas · 79.9 MW · built
- 23rd St and 3rd AveGas · 79.9 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem