United States › Grid › Interconnection queues › New York
GAS · NYISOKeySpan Ravenswood
KeySpan Ravenswood is a 270 MW gas request built and operating in the NYISO interconnection queue, in New York County, New York, connecting to CONED.
Request details
- Queue ID
- 17
- Grid region
- NYISO (New York)
- Utility / transmission owner
- CONED
- Developer
- KeySpan Energy, Inc.
- Connection point (POI)
- Vernon
- Location
- New York County, New York
- Technology
- Gas: 270 MW
- Total requested
- 270 MW
- Study phase
- SRIS,CY01,CY02
- Queue status
- Operational
- Entered queue
- 21 April 1999
Location
Marker shows the centre of New York County; the queue data does not give exact sites.
Other requests in New York County
- East River RepoweringGas · 288 MW · built
- East River RepoweringGas · 288 MW · built
- KeySpan RavenswoodGas · 270 MW · built
- Hell GateGas · 79.9 MW · built
- Harlem River YardsGas · 79.9 MW · built
- Harlem River YardsGas · 79.9 MW · built
- Hell GateGas · 79.9 MW · built
- Vernon BlvdGas · 79.9 MW · built
- Vernon BlvdGas · 79.9 MW · built
- 23rd St and 3rd AveGas · 79.9 MW · built
- 23rd St and 3rd AveGas · 79.9 MW · built
- Fox HillsGas · 44.0 MW · built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem