Hell Gate is a 79.9 MW gas request built and operating in the NYISO interconnection queue, in New York County, New York, connecting to CONED.
Request details
- Queue ID
- 80
- Grid region
- NYISO (New York)
- Utility / transmission owner
- CONED
- Developer
- NYPA
- Connection point (POI)
- Hell Gate Substation
- Location
- New York County, New York
- Technology
- Gas: 79.9 MW
- Total requested
- 79.9 MW
- Study phase
- SRIS,CY01
- Queue status
- Operational
- Entered queue
- 5 December 2000
Location
Marker shows the centre of New York County; the queue data does not give exact sites.
Other requests in New York County
- East River RepoweringGas Β· 288 MW Β· built
- East River RepoweringGas Β· 288 MW Β· built
- KeySpan RavenswoodGas Β· 270 MW Β· built
- KeySpan RavenswoodGas Β· 270 MW Β· built
- Harlem River YardsGas Β· 79.9 MW Β· built
- Harlem River YardsGas Β· 79.9 MW Β· built
- Hell GateGas Β· 79.9 MW Β· built
- Vernon BlvdGas Β· 79.9 MW Β· built
- Vernon BlvdGas Β· 79.9 MW Β· built
- 23rd St and 3rd AveGas Β· 79.9 MW Β· built
- 23rd St and 3rd AveGas Β· 79.9 MW Β· built
- Fox HillsGas Β· 44.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem