United States βΊ Grid βΊ Interconnection queues βΊ Illinois
ONSHORE WIND Β· PJMBig Sky
Big Sky is a 240 MW onshore wind request built and operating in the PJM interconnection queue, in Bureau County, Illinois, connecting to ComEd.
Request details
- Queue ID
- P36
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- ComEd
- Connection point (POI)
- Nelson - Lee Co. EC 345kV
- Location
- Bureau County, Illinois
- Technology
- Wind: 240 MW
- Total requested
- 240 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Operational
- Entered queue
- 22 December 2005
- Proposed online date
- August 2010
- Came online
- August 2010
Location
Marker shows the centre of Bureau County; the queue data does not give exact sites.
Other requests in Bureau County
- Bluejacket SolarSolar Β· 205 MW Β· in study
- Solar project J3944, Bureau CountySolar Β· 200 MW Β· in study
- Onshore wind project J1755, Bureau CountyOnshore wind Β· 147 MW Β· in study
- Onshore wind project AI2-487, Bureau CountyOnshore wind Β· 97.2 MW Β· in study
- Onshore wind project AI2-400, Bureau CountyOnshore wind Β· 25.0 MW Β· in study
- Lone Tree WindOnshore wind Β· 79.4 MW Β· built
- Providence Heights WFOnshore wind Β· 74.0 MW Β· built
- Onshore wind project AG1-121, Bureau CountyOnshore wind Β· 295 MW Β· withdrawn
- Onshore wind project G561, Bureau CountyOnshore wind Β· 210 MW Β· withdrawn
- Walnut Ridge Wind FarmOnshore wind Β· 210 MW Β· withdrawn
- Onshore wind project R59, Bureau CountyOnshore wind Β· 160 MW Β· withdrawn
- Onshore wind project P21, Bureau CountyOnshore wind Β· 150 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem