ONSHORE WIND Β· MISOOnshore wind project G561, Bureau County
Onshore wind project G561, Bureau County is a 210 MW onshore wind request withdrawn in the MISO interconnection queue, in Bureau County, Illinois.
Queue statusWithdrawn / abandoned
- PlanningQueued Oct 2005 (completed)
- Withdrawn / abandonedMar 2006 (project stopped here)
- ConsentedMar 2006 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G561
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Princeton 138 kV Substation
- Location
- Bureau County, Illinois
- Technology
- Wind: 210 MW
- Total requested
- 210 MW
- Queue status
- Withdrawn
- Entered queue
- 31 October 2005
- Agreement signed
- 22 March 2006
- Proposed online date
- April 2007
- Withdrawn
- March 2006
Location
Marker shows the centre of Bureau County; the queue data does not give exact sites.
Other requests in Bureau County
- Bluejacket SolarSolar Β· 205 MW Β· in study
- Solar project J3944, Bureau CountySolar Β· 200 MW Β· in study
- Onshore wind project J1755, Bureau CountyOnshore wind Β· 147 MW Β· in study
- Onshore wind project AI2-487, Bureau CountyOnshore wind Β· 97.2 MW Β· in study
- Onshore wind project AI2-400, Bureau CountyOnshore wind Β· 25.0 MW Β· in study
- Big SkyOnshore wind Β· 240 MW Β· built
- Lone Tree WindOnshore wind Β· 79.4 MW Β· built
- Providence Heights WFOnshore wind Β· 74.0 MW Β· built
- Onshore wind project AG1-121, Bureau CountyOnshore wind Β· 295 MW Β· withdrawn
- Walnut Ridge Wind FarmOnshore wind Β· 210 MW Β· withdrawn
- Onshore wind project R59, Bureau CountyOnshore wind Β· 160 MW Β· withdrawn
- Onshore wind project P21, Bureau CountyOnshore wind Β· 150 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem