United States β€Ί Grid β€Ί Interconnection queues β€Ί Missouri

SOLAR Β· SOUTHEAST

Solar project GI-68, Jasper County

Solar project GI-68, Jasper County is a 200 MW solar request withdrawn in the Southeast interconnection queue, in Jasper County, Missouri, connecting to Associated Electric Cooperative, Incorporated.

Queue statusWithdrawn / abandoned
  1. PlanningQueued May 2018 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GI-68
Grid region
Southeast (non-ISO utilities)
Utility / transmission owner
Associated Electric Cooperative, Incorporated
Connection point (POI)
Blackberry 345 kV
Location
Jasper County, Missouri
Technology
Solar: 200 MW
Total requested
200 MW
Service type
Network resource (NRIS)
Queue status
Withdrawn
Entered queue
24 May 2018
Proposed online date
September 2023

Location

Marker shows the centre of Jasper County; the queue data does not give exact sites.

Power plants in Missouri Β· Transmission lines in Missouri

Other requests in Jasper County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem