πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Missouri

GAS Β· SPP

Gas project GEN-2003-011, Jasper County

Gas project GEN-2003-011, Jasper County is a 600 MW gas request withdrawn in the SPP interconnection queue, in Jasper County, Missouri, connecting to EDE.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Jul 2003 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2003-011
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
EDE
Location
Jasper County, Missouri
Technology
Gas: 600 MW
Total requested
600 MW
Service type
Energy only (ERIS)
Study phase
WITHDRAWN
Queue status
Withdrawn
Entered queue
24 July 2003
Proposed online date
June 2010

Location

Marker shows the centre of Jasper County; the queue data does not give exact sites.

Power plants in Missouri Β· Transmission lines in Missouri

Other requests in Jasper County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem