BATTERY STORAGE · SPPBattery storage project GEN-2023-061, Jasper County
Battery storage project GEN-2023-061, Jasper County is a 100 MW battery storage request in interconnection study in the SPP interconnection queue, in Jasper County, Missouri, connecting to SWPA.
Queue statusIn planning
- PlanningQueued Oct 2023 (current stage)
- Consented (not yet reached)
- Construction (not yet reached)
- OperatingTarget Dec 2029 (not yet reached)
- Closed (not yet reached)
Studies assess what grid upgrades the project would need and who pays for them. A signed interconnection agreement is the main step before construction.
Request details
- Queue ID
- GEN-2023-061
- Grid region
- SPP (Southwest Power Pool)
- Utility / transmission owner
- SWPA
- Connection point (POI)
- Carthage 161 kV Substation
- Location
- Jasper County, Missouri
- Technology
- Battery: 100 MW
- Total requested
- 100 MW
- Service type
- NRIS and ERIS
- Study phase
- FACILITY STUDY STAGE
- Queue status
- Active
- Entered queue
- 2 October 2023
- Proposed online date
- December 2029
Location
Marker shows the centre of Jasper County; the queue data does not give exact sites.
Other requests in Jasper County
- Solar project GEN-2020-088, Jasper CountySolar · 150 MW · agreement signed
- Gas project GEN-2020-064, Jasper CountyGas · 64.0 MW · agreement signed
- Gas project ERAS-2025-034, Jasper CountyGas · 250 MW · in study
- Battery storage project GEN-2024-091, Jasper CountyBattery storage · 100 MW · in study
- Gas project GEN-2001-030, Jasper CountyGas · 50.0 MW · built
- Gas project GEN-2001-040, Jasper CountyGas · 50.0 MW · built
- Gas project GEN-2016-013, Jasper CountyGas · 10.0 MW · built
- Gas project GEN-2016-014, Jasper CountyGas · 10.0 MW · built
- Gas project GEN-2003-011, Jasper CountyGas · 600 MW · withdrawn
- Coal project GEN-2003-007, Jasper CountyCoal · 550 MW · withdrawn
- Solar project GI-94, Jasper CountySolar · 225 MW · withdrawn
- Solar project GEN-2017-189, Jasper CountySolar · 202 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem