United States βΊ Grid βΊ Interconnection queues βΊ Connecticut
GAS Β· ISO-NEFuel Cell
Fuel Cell is a 20.2 MW gas request withdrawn in the ISO-NE interconnection queue, in Hartford County, Connecticut.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2019 (completed)
- Withdrawn / abandonedSep 2019 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 885
- Grid region
- ISO-NE (New England)
- Connection point (POI)
- Black Rock Substation (Eversource) via the Farmington River Power Company owned Burritt St substation 69kv line 680
- Location
- Hartford County, Connecticut
- Technology
- Gas: 20.2 MW
- Total requested
- 20.2 MW
- Service type
- Network resource (NRIS)
- Queue status
- Withdrawn
- Entered queue
- 25 April 2019
- Proposed online date
- June 2020
- Withdrawn
- September 2019
Location
No county location in the queue data.
Power plants in Connecticut Β· Transmission lines in Connecticut
Other requests in Hartford County
- SolarSolar Β· 150 MW Β· agreement signed
- Broadleaf SolarSolar Β· 101 MW Β· agreement signed
- SolarSolar Β· 25.0 MW Β· in study
- Solar IncreaseSolar Β· 5.0 MW Β· in study
- Gravel Pit SolarSolar Β· 50.0 MW Β· built
- Algonquin Power Windsor Locks Cogeneration FacilitGas Β· 47.5 MW Β· built
- Gravel Pit Solar IncreaseSolar Β· 45.0 MW Β· built
- SolarSolar Β· 26.4 MW Β· built
- Gravel Pit Solar increaseSolar Β· 25.0 MW Β· built
- NB Fuel CellGas Β· 20.2 MW Β· built
- Nutmeg Solar, LLCSolar Β· 19.9 MW Β· built
- Hamilton SundstrandGas Β· 5.0 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem