United States βΊ Grid βΊ Interconnection queues βΊ Colorado
ONSHORE WIND Β· WESTOnshore wind project 17-08072, Larimer County
Onshore wind project 17-08072, Larimer County is a 80.0 MW onshore wind request withdrawn in the West interconnection queue, in Larimer County, Colorado, connecting to Platte River Power Authority.
Queue statusWithdrawn / abandoned
- PlanningQueued Aug 2017 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 17-08072
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- Platte River Power Authority
- Connection point (POI)
- Rawhide 230kV
- Location
- Larimer County, Colorado
- Technology
- Wind: 80.0 MW
- Total requested
- 80.0 MW
- Queue status
- Withdrawn
- Entered queue
- 7 August 2017
- Proposed online date
- December 2019
Location
Marker shows the centre of Larimer County; the queue data does not give exact sites.
Other requests in Larimer County
- Solar project 18-11071, Larimer CountySolar Β· 150 MW Β· under construction
- Gas project 22-07251, Larimer CountyGas Β· 250 MW Β· in study
- Wind + storage project 22-07252, Larimer CountyWind + storage Β· 200 MW Β· in study
- Battery storage project 24-03011, Larimer CountyBattery storage Β· 130 MW Β· in study
- Battery storage project 21-11157, Larimer CountyBattery storage Β· 125 MW Β· in study
- Solar project 20-02261, Larimer CountySolar Β· 100 MW Β· in study
- Solar project 25-041825, Larimer CountySolar Β· 50.0 MW Β· in study
- Battery storage project 23-05032, Larimer CountyBattery storage Β· 50.0 MW Β· in study
- Battery storage project 23-08081, Larimer CountyBattery storage Β· 50.0 MW Β· in study
- Battery storage project 23-09191, Larimer CountyBattery storage Β· 15.0 MW Β· in study
- Solar project 24-10021, Larimer CountySolar Β· 10.0 MW Β· in study
- Onshore wind project 17-07183, Larimer CountyOnshore wind Β· 100 MW Β· built
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem