Solar project GEN-2015-020, Roosevelt County

Solar project GEN-2015-020, Roosevelt County is a 100 MW solar request withdrawn in the SPP interconnection queue, in Roosevelt County, New Mexico, connecting to SPS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2015 (completed)
  2. Withdrawn / abandonedMar 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. OperatingDec 2021 (not reached)
  6. Closed (not reached)

Request details

Queue ID
GEN-2015-020
Grid region
SPP (Southwest Power Pool)
Utility / transmission owner
SPS
Connection point (POI)
Oasis 115kV
Location
Roosevelt County, New Mexico
Technology
Solar: 100 MW
Total requested
100 MW
Service type
Energy only (ERIS)
Study phase
TERMINATED
Queue status
Withdrawn
Entered queue
31 March 2015
Proposed online date
December 2021
Came online
December 2021
Withdrawn
March 2020

Location

Marker shows the centre of Roosevelt County; the queue data does not give exact sites.

Power plants in New Mexico Β· Transmission lines in New Mexico

Other requests in Roosevelt County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem