πŸ”Œ EV Partnership Switch to Octopus Energy & unlock exclusive smart EV charging rates Find out more β†’ Skip to main content

United States β€Ί Grid β€Ί Interconnection queues β€Ί Maryland

SOLAR Β· PJM

Shugart Solar

Shugart Solar is a 32.5 MW solar request withdrawn in the PJM interconnection queue, in Charles County, Maryland, connecting to SMECO.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Mar 2017 (completed)
  2. Withdrawn / abandonedDec 2020 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AC2-101
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
SMECO
Connection point (POI)
Ripley-Nanjemoy 69kV
Location
Charles County, Maryland
Technology
Solar: 32.5 MW
Total requested
32.5 MW
Service type
Network resource (NRIS)
Study phase
Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
Queue status
Withdrawn
Entered queue
10 March 2017
Proposed online date
March 2021
Withdrawn
December 2020

Location

Marker shows the centre of Charles County; the queue data does not give exact sites.

Power plants in Maryland Β· Transmission lines in Maryland

Other requests in Charles County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem