United States β€Ί Grid β€Ί Interconnection queues β€Ί Washington

SOLAR Β· WEST

Solar project G0603, Garfield County

Solar project G0603, Garfield County is a 275 MW solar request withdrawn in the West interconnection queue, in Garfield County, Washington.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Oct 2018 (completed)
  2. Withdrawn / abandoned (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
G0603
Grid region
West (non-ISO utilities)
Connection point (POI)
Central Ferry Substation
Location
Garfield County, Washington
Technology
Solar: 275 MW
Total requested
275 MW
Service type
NRIS and ERIS
Queue status
Withdrawn
Entered queue
19 October 2018
Proposed online date
December 2022

Location

Marker shows the centre of Garfield County; the queue data does not give exact sites.

Power plants in Washington Β· Transmission lines in Washington

Other requests in Garfield County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem