United States β€Ί Grid β€Ί Interconnection queues β€Ί New Jersey

GAS Β· PJM

Paramus 480V

Paramus 480V is a 0.2 MW gas request withdrawn in the PJM interconnection queue, in Bergen County, New Jersey, connecting to PSEG.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Apr 2017 (completed)
  2. Withdrawn / abandonedJun 2018 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AD1-004
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
PSEG
Connection point (POI)
Paramus 480 v
Location
Bergen County, New Jersey
Technology
Gas: 0.2 MW
Total requested
0.2 MW
Service type
Energy only (ERIS)
Study phase
Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Withdrawn
Queue status
Withdrawn
Entered queue
3 April 2017
Proposed online date
January 2020
Withdrawn
June 2018

Location

Marker shows the centre of Bergen County; the queue data does not give exact sites.

Power plants in New Jersey Β· Transmission lines in New Jersey

Other requests in Bergen County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem