United States › Grid › Interconnection queues › Pennsylvania

BATTERY STORAGE · PJM

Springdale Battery Storage II

Springdale Battery Storage II is a 250 MW battery storage request withdrawn in the PJM interconnection queue, in Allegheny County, Pennsylvania, connecting to APS.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Sep 2021 (completed)
  2. Withdrawn / abandonedJun 2025 (project stopped here)
  3. Consented (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
AH1-562
Grid region
PJM (Mid-Atlantic, Midwest)
Utility / transmission owner
APS
Developer
Springdale Energy, LLC
Connection point (POI)
Springdale 138kV
Location
Allegheny County, Pennsylvania
Technology
Battery: 250 MW
Total requested
250 MW
Service type
Network resource (NRIS)
Study phase
In Progress (unknown study)
Queue status
Withdrawn
Entered queue
10 September 2021
Proposed online date
June 2025
Withdrawn
June 2025

Location

Marker shows the centre of Allegheny County; the queue data does not give exact sites.

Power plants in Pennsylvania · Transmission lines in Pennsylvania

Other requests in Allegheny County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem