BATTERY STORAGE · PJMAES Warrior Run Energy Storage
AES Warrior Run Energy Storage is a 11.0 MW battery storage request built and operating in the PJM interconnection queue, in Allegheny County, Pennsylvania, connecting to APS.
Request details
- Queue ID
- AA1-100
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- APS
- Connection point (POI)
- Warrior Run 138kV
- Location
- Allegheny County, Pennsylvania
- Technology
- Battery: 11.0 MW
- Total requested
- 11.0 MW
- Service type
- Energy only (ERIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study; Interim/Interconnection Service Agreement: Document Posted
- Queue status
- Operational
- Entered queue
- 30 October 2014
- Agreement signed
- 23 September 2015
- Proposed online date
- October 2015
- Came online
- October 2015
Location
Marker shows the centre of Allegheny County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Allegheny County
- Battery storage project AH2-244, Allegheny CountyBattery storage · 25.0 MW · in study
- Battery storage project AH2-245, Allegheny CountyBattery storage · 25.0 MW · in study
- Solar project AG2-037, Allegheny CountySolar · 4.7 MW · in study
- Springdale CT3, CT4, ST5Gas · 525 MW · built
- Springdale 1 & 2Gas · 96.0 MW · built
- SpringdaleGas · 50.4 MW · built
- Pittsburgh International AirportGas · 14.4 MW · built
- Luke PaperCoal · 8.0 MW · built
- Coal project V1-013, Allegheny CountyCoal · 580 MW · withdrawn
- Allegheny Energy Center LLCGas · 541 MW · withdrawn
- Gas project G06_W47, Allegheny CountyGas · 500 MW · withdrawn
- Battery storage project AI1-176, Allegheny CountyBattery storage · 300 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem