United States › Grid › Interconnection queues › Pennsylvania
GAS · PJMAllegheny Energy Center LLC
Allegheny Energy Center LLC is a 541 MW gas request withdrawn in the PJM interconnection queue, in Allegheny County, Pennsylvania, connecting to APS.
Queue statusWithdrawn / abandoned
- PlanningQueued May 2015 (completed)
- Withdrawn / abandonedOct 2023 (project stopped here)
- ConsentedJan 2020 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AA2-161
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- APS
- Connection point (POI)
- Yukon-Robbins 138kV
- Location
- Allegheny County, Pennsylvania
- Technology
- Gas: 541 MW
- Total requested
- 541 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 1 May 2015
- Agreement signed
- 16 January 2020
- Proposed online date
- September 2027
- Withdrawn
- October 2023
Location
Marker shows the centre of Allegheny County; the queue data does not give exact sites.
Power plants in Pennsylvania · Transmission lines in Pennsylvania
Other requests in Allegheny County
- Battery storage project AH2-244, Allegheny CountyBattery storage · 25.0 MW · in study
- Battery storage project AH2-245, Allegheny CountyBattery storage · 25.0 MW · in study
- Solar project AG2-037, Allegheny CountySolar · 4.7 MW · in study
- Springdale CT3, CT4, ST5Gas · 525 MW · built
- Springdale 1 & 2Gas · 96.0 MW · built
- SpringdaleGas · 50.4 MW · built
- Pittsburgh International AirportGas · 14.4 MW · built
- AES Warrior Run Energy StorageBattery storage · 11.0 MW · built
- Luke PaperCoal · 8.0 MW · built
- Coal project V1-013, Allegheny CountyCoal · 580 MW · withdrawn
- Gas project G06_W47, Allegheny CountyGas · 500 MW · withdrawn
- Battery storage project AI1-176, Allegheny CountyBattery storage · 300 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem