United States βΊ Grid βΊ Interconnection queues βΊ New York
SOLAR Β· NYISONY08 Solar
NY08 Solar is a 20.0 MW solar request withdrawn in the NYISO interconnection queue, in Washington County, New York, connecting to NM-NG.
Queue statusWithdrawn / abandoned
- PlanningQueued Jun 2020 (completed)
- Withdrawn / abandoned (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- 1035
- Grid region
- NYISO (New York)
- Utility / transmission owner
- NM-NG
- Developer
- Easton Solar LLC
- Connection point (POI)
- Battenkill Substation 34.5kV
- Location
- Washington County, New York
- Technology
- Solar: 20.0 MW
- Total requested
- 20.0 MW
- Queue status
- Withdrawn
- Entered queue
- 22 June 2020
Location
Marker shows the centre of Washington County; the queue data does not give exact sites.
Other requests in Washington County
- Fort Edward Solar Farm (NY53)Solar Β· 100 MW Β· in study
- Somers Solar, LLCSolar Β· 20.0 MW Β· in study
- NY13 SolarSolar Β· 20.0 MW Β· in study
- Dolan SolarSolar Β· 20.0 MW Β· in study
- Branscomb SolarSolar Β· 20.0 MW Β· built
- Darby SolarSolar Β· 20.0 MW Β· built
- Darby SolarSolar Β· 20.0 MW Β· built
- Branscomb SolarSolar Β· 20.0 MW Β· built
- Fort Edward Solar Farm (NY53)Solar Β· 100 MW Β· withdrawn
- Blue Star SolarSolar Β· 100 MW Β· withdrawn
- Champlain SolarSolar Β· 100 MW Β· withdrawn
- Fort Edward Solar Farm (NY53)Solar Β· 100 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem