ONSHORE WIND · WESTOnshore wind project GI-0713, Jerauld County
Onshore wind project GI-0713, Jerauld County is a 50.0 MW onshore wind request built and operating in the West interconnection queue, in Jerauld County, South Dakota, connecting to WAPA/BEPC/HCPD Integrated System.
Request details
- Queue ID
- GI-0713
- Grid region
- West (non-ISO utilities)
- Utility / transmission owner
- WAPA/BEPC/HCPD Integrated System
- Developer
- PrairieWinds SD1 Inc.
- Connection point (POI)
- Wessington Springs 230kV
- Location
- Jerauld County, South Dakota
- Technology
- Wind: 50.0 MW
- Total requested
- 50.0 MW
- Service type
- NRIS and ERIS
- Study phase
- IAE/IS
- Queue status
- Operational
- Entered queue
- 11 June 2007
- Proposed online date
- December 2010
Location
Marker shows the centre of Jerauld County; the queue data does not give exact sites.
Power plants in South Dakota · Transmission lines in South Dakota
Other requests in Jerauld County
- Onshore wind project GI-0714, Jerauld CountyOnshore wind · 100 MW · built
- Onshore wind project GI-0602, Jerauld CountyOnshore wind · 53.0 MW · built
- Onshore wind project GI-1003, Jerauld CountyOnshore wind · 34.0 MW · built
- Other project GI-0509, Jerauld CountyOther · 4.0 MW · built
- Other project GI-0603, Jerauld CountyOther · 2.0 MW · built
- Other project 166, Jerauld CountyOther · 0.5 MW · built
- Onshore wind project G731, Jerauld CountyOnshore wind · 750 MW · withdrawn
- Onshore wind project GEN-2016-054, Jerauld CountyOnshore wind · 3.4 MW · withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem