United States βΊ Grid βΊ Interconnection queues βΊ South Dakota
ONSHORE WIND Β· MISOOnshore wind project G731, Jerauld County
Onshore wind project G731, Jerauld County is a 750 MW onshore wind request withdrawn in the MISO interconnection queue, in Jerauld County, South Dakota.
Queue statusWithdrawn / abandoned
- PlanningQueued Jan 2007 (completed)
- Withdrawn / abandonedAug 2010 (project stopped here)
- ConsentedAug 2010 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- G731
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- Split Rock Substation
- Location
- Jerauld County, South Dakota
- Technology
- Wind: 750 MW
- Total requested
- 750 MW
- Study phase
- SPA - SIS
- Queue status
- Withdrawn
- Entered queue
- 29 January 2007
- Agreement signed
- 26 August 2010
- Proposed online date
- May 2007
- Withdrawn
- August 2010
Location
Marker shows the centre of Jerauld County; the queue data does not give exact sites.
Power plants in South Dakota Β· Transmission lines in South Dakota
Other requests in Jerauld County
- Onshore wind project GI-0714, Jerauld CountyOnshore wind Β· 100 MW Β· built
- Onshore wind project GI-0602, Jerauld CountyOnshore wind Β· 53.0 MW Β· built
- Onshore wind project GI-0713, Jerauld CountyOnshore wind Β· 50.0 MW Β· built
- Onshore wind project GI-1003, Jerauld CountyOnshore wind Β· 34.0 MW Β· built
- Other project GI-0509, Jerauld CountyOther Β· 4.0 MW Β· built
- Other project GI-0603, Jerauld CountyOther Β· 2.0 MW Β· built
- Other project 166, Jerauld CountyOther Β· 0.5 MW Β· built
- Onshore wind project GEN-2016-054, Jerauld CountyOnshore wind Β· 3.4 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem