Onshore wind project GI-0602, Jerauld County

Onshore wind project GI-0602, Jerauld County is a 53.0 MW onshore wind request built and operating in the West interconnection queue, in Jerauld County, South Dakota, connecting to WAPA/BEPC/HCPD Integrated System.

Queue statusOperating
  1. PlanningQueued Mar 2006 (completed)
  2. Consented (completed)
  3. Construction (completed)
  4. OperatingTarget Dec 2008 (current stage)
  5. Closed (not yet reached)

Request details

Queue ID
GI-0602
Grid region
West (non-ISO utilities)
Utility / transmission owner
WAPA/BEPC/HCPD Integrated System
Developer
Wess Wind I LLC
Connection point (POI)
Wessington Springs 230kV
Location
Jerauld County, South Dakota
Technology
Wind: 53.0 MW
Total requested
53.0 MW
Service type
Network resource (NRIS)
Study phase
IAE/IS
Queue status
Operational
Entered queue
31 March 2006
Proposed online date
December 2008

Location

Marker shows the centre of Jerauld County; the queue data does not give exact sites.

Power plants in South Dakota · Transmission lines in South Dakota

Other requests in Jerauld County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem