United States β€Ί Grid β€Ί Interconnection queues β€Ί South Dakota

ONSHORE WIND Β· MISO

Onshore wind project H095, Roberts County

Onshore wind project H095, Roberts County is a 550 MW onshore wind request withdrawn in the MISO interconnection queue, in Roberts County, South Dakota.

Queue statusWithdrawn / abandoned
  1. PlanningQueued Aug 2008 (completed)
  2. Withdrawn / abandonedMay 2011 (project stopped here)
  3. ConsentedMay 2011 (not reached)
  4. Construction (not reached)
  5. Operating (not reached)
  6. Closed (not reached)

Request details

Queue ID
H095
Grid region
MISO (Midcontinent)
Connection point (POI)
Invenergy's Hurricane Lake Wind Energy Center (MISO G699) proposed substation which will tap Big Stone-Hankinson 230kV
Location
Roberts County, South Dakota
Technology
Wind: 550 MW
Total requested
550 MW
Study phase
SPA - SIS
Queue status
Withdrawn
Entered queue
4 August 2008
Agreement signed
4 May 2011
Proposed online date
June 2010
Withdrawn
May 2011

Location

Marker shows the centre of Roberts County; the queue data does not give exact sites.

Power plants in South Dakota Β· Transmission lines in South Dakota

Other requests in Roberts County

Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem