United States βΊ Grid βΊ Interconnection queues βΊ South Dakota
ONSHORE WIND Β· MISOOnshore wind project J266, Roberts County
Onshore wind project J266, Roberts County is a 200 MW onshore wind request withdrawn in the MISO interconnection queue, in Roberts County, South Dakota.
Queue statusWithdrawn / abandoned
- PlanningQueued Nov 2012 (completed)
- Withdrawn / abandonedJul 2014 (project stopped here)
- ConsentedJul 2014 (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J266
- Grid region
- MISO (Midcontinent)
- Connection point (POI)
- OTP Big Stone Substation 345 kV
- Location
- Roberts County, South Dakota
- Technology
- Wind: 200 MW
- Total requested
- 200 MW
- Study phase
- Feasibility
- Queue status
- Withdrawn
- Entered queue
- 19 November 2012
- Agreement signed
- 8 July 2014
- Proposed online date
- October 2014
- Withdrawn
- July 2014
Location
Marker shows the centre of Roberts County; the queue data does not give exact sites.
Power plants in South Dakota Β· Transmission lines in South Dakota
Other requests in Roberts County
- Battery storage project J2852, Roberts CountyBattery storage Β· 200 MW Β· in study
- Onshore wind project G884, Roberts CountyOnshore wind Β· 1,500 MW Β· withdrawn
- Onshore wind project H095, Roberts CountyOnshore wind Β· 550 MW Β· withdrawn
- Onshore wind project G982, Roberts CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project G699, Roberts CountyOnshore wind Β· 250 MW Β· withdrawn
- Battery storage project J3824, Roberts CountyBattery storage Β· 250 MW Β· withdrawn
- Onshore wind project GI-0703, Roberts CountyOnshore wind Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem