United States βΊ Grid βΊ Interconnection queues βΊ South Dakota
BATTERY STORAGE Β· MISOBattery storage project J3824, Roberts County
Battery storage project J3824, Roberts County is a 250 MW battery storage request withdrawn in the MISO interconnection queue, in Roberts County, South Dakota, connecting to OTTER TAIL POWER COMPANY.
Queue statusWithdrawn / abandoned
- PlanningQueued Apr 2024 (completed)
- Withdrawn / abandonedJun 2024 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- J3824
- Grid region
- MISO (Midcontinent)
- Utility / transmission owner
- OTTER TAIL POWER COMPANY
- Connection point (POI)
- Twin Brooks 345 kV Substation
- Location
- Roberts County, South Dakota
- Technology
- Battery: 250 MW
- Total requested
- 250 MW
- Service type
- Network resource (NRIS)
- Study phase
- Study Phase: DPP 1
- Queue status
- Withdrawn
- Entered queue
- 18 April 2024
- Proposed online date
- September 2028
- Withdrawn
- June 2024
Location
Marker shows the centre of Roberts County; the queue data does not give exact sites.
Power plants in South Dakota Β· Transmission lines in South Dakota
Other requests in Roberts County
- Battery storage project J2852, Roberts CountyBattery storage Β· 200 MW Β· in study
- Onshore wind project G884, Roberts CountyOnshore wind Β· 1,500 MW Β· withdrawn
- Onshore wind project H095, Roberts CountyOnshore wind Β· 550 MW Β· withdrawn
- Onshore wind project G982, Roberts CountyOnshore wind Β· 300 MW Β· withdrawn
- Onshore wind project G699, Roberts CountyOnshore wind Β· 250 MW Β· withdrawn
- Onshore wind project J266, Roberts CountyOnshore wind Β· 200 MW Β· withdrawn
- Onshore wind project GI-0703, Roberts CountyOnshore wind Β· 200 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem