Solar + storage project AF2-204, Grant County is a 110 MW solar + storage request withdrawn in the PJM interconnection queue, in Grant County, Indiana, connecting to AEP.
Queue statusWithdrawn / abandoned
- PlanningQueued Mar 2020 (completed)
- Withdrawn / abandonedJan 2025 (project stopped here)
- Consented (not reached)
- Construction (not reached)
- Operating (not reached)
- Closed (not reached)
Request details
- Queue ID
- AF2-204
- Grid region
- PJM (Mid-Atlantic, Midwest)
- Utility / transmission owner
- AEP
- Connection point (POI)
- Van Buren-Delaware 138 kV
- Location
- Grant County, Indiana
- Technology
- Solar: 110 MW Β· Battery
- Total requested
- 110 MW
- Service type
- Network resource (NRIS)
- Study phase
- Available studies: Feasibility Study, System Impact Study, Facilities Study; Interim/Interconnection Service Agreement:
- Queue status
- Withdrawn
- Entered queue
- 24 March 2020
- Proposed online date
- June 2023
- Withdrawn
- January 2025
Location
Marker shows the centre of Grant County; the queue data does not give exact sites.
Other requests in Grant County
- BR Solar Sheriff 1Solar Β· 75.0 MW Β· agreement signed
- Solar + storage project AI1-134, Grant CountySolar + storage Β· 200 MW Β· in study
- Solar + storage project AG2-191, Grant CountySolar + storage Β· 30.0 MW Β· in study
- Solar + storage project AG2-192, Grant CountySolar + storage Β· 19.0 MW Β· in study
- Golden Aster Solar Energy CenterSolar Β· 160 MW Β· suspended
- Golden Aster Solar Energy CenterBattery storage Β· 40.0 MW Β· suspended
- Deer Creek Solar FacilitySolar Β· 2.5 MW Β· built
- Solar project J2251, Grant CountySolar Β· 200 MW Β· withdrawn
- Solar + storage project AG2-412, Grant CountySolar + storage Β· 100 MW Β· withdrawn
- Solar + storage project AG2-546, Grant CountySolar + storage Β· 40.0 MW Β· withdrawn
Source: Lawrence Berkeley National Laboratory, Queued Up, data through end of 2025, compiled from ISO/RTO and utility queues. Check the grid operator's own queue for the latest status. Report a problem